Kitchen Demolition – 09/30/06
Comments Off on Kitchen Demolition – 09/30/06 Our first big demolition day was great. When we were done we felt like we had really accomplished a lot:

Prep work…removing the cabinet doors from the built-in.

Patrick proudly showing off the pile of drop-ceiling.

Patrick examining the hardcore built drop-ceiling structure.

Removing the wood paneling.

Tackling the plaster.

Arrrrrrrggh.

Half-way through removing the drop-ceiling beams…or so he thought…

Some kind of vent pipe or something.

The cut pipes (done pre-purchase) and rotten wood.

More water damage to the hardwood floors and the plywood to replace it.

End of day one…quite an achievement!

The pile of demolition stuff (pre-dumpster) stored in the laundry room.
Comments are closed