Category Archive: Photos

So Much Light

Ray had been back again to nearly finish the lights. This time he hooked everything to the fuse box, so the installed lights actually work! This was quite a change for us – no more construction flood lights?! It sheds a whole new light (haha) on our house. It made it feel quite different. I had to exclaim “oh my God” every 10 minutes because I was so excited to be in our house with lights on!

Our cool kitchen lights. Our contractor had been worried that the 50 watt lights that we had picked would not be sufficient to light everything up. We had struggled a lot because we felt like the recessed lighting design was just overall lacking and these were the only lights that we actually liked (they have a silver trim). 50 watt bulbs times 10 in the main kitchen and 2 in the Butler’s pantry proved to be plenty of light!

Kitchen recessed lights

Ray hooked up our dishwasher so the electrical inspection can pass. For us it of course means one step closer to making things feel like home.

Dishwasher installation

Me standing in the bath, getting the dust pan ready to do some cleaning.

Bathroom cleaning

Our project for the night (with lights on, yay!) was to clean the fireplace in the middle bedroom. It was covered in dirt and dust and we managed to get it cleaned up a little bit. Unfortunately we found dried drips of what looks like floor refinishing liquid on the beautiful tiles and suspect that they are new. Not quite sure how we can clean that off…

Bedroom fire place

Meanwhile back at the loft we have started packing. Ack, crazy!!

Moving

Posted in Our Bungalow, Photos, Westview Bungalow | Tagged , , , , , , , , , , , | Comments Off on So Much Light

Flooring

The floor people were originally supposed to come Wednesday, but were unable to due to a flat tire. They were supposed to come Thursday instead but never called or came either. This screwed up a few of our painting plans. Finally on Sunday they returned to do the 2nd coat of polyurethane. This limited our work at the house, but the floors look oh so beautiful!

The brand new coated floors, still wet.

Kitchen hardwood floor polyurethane

The only place we were able to work on this cold, rainy day without disturbing the floord was the laundry. We sanded down some more of the difficult molding areas of the bathroom door.

Bathroom door sanding

Posted in Our Bungalow, Photos, Westview Bungalow | Tagged , , , , , , , , , , , | Comments Off on Flooring

Lights and Bathroom

I’m starting to fall a little behind again, so I’m going to make a couple of entries.

I got so caught up with the ugliness of what’s behind the range vent hood that I completely forgot to document the actual hood! So here it is.

Stove vent hood

Ray was back this Saturday to install the lights. He also found that kitchen light that had gone missing during drywalling.

Recessed lights

Our beautiful, precious Rejuvenation light. Since it was our little gem we were breathing down Ray’s neck the entire time he was installing out baby, haha.

Dining room light

A fan/light combo we found at Lowe’s that I’m really happy with. We installed the same light in all 3 bedrooms. Also note the old steam pipe that has yet to be removed in the background.

Bedroom light

Special concrete sheetrock was installed on the bathroom floor and around the tub.

Bathroom Durock floor

Our custom shower shelf.

Bathroom Durock shower

We continued working on the bathroom door until it got dark.

Paint stripping door

Posted in Our Bungalow, Photos, Westview Bungalow | Tagged , , , , , , , , , , , , , , , , , , , | Comments Off on Lights and Bathroom

Vent & HVAC – 01/19/2007

Doesn’t the range vent look pretty? NOT. We specifically bought a vent that could go through the back and up through the drywall. Instead they tore two ugly holes into our kitchen cabinet!! Even our contractor was shocked that the subs had done this (since we had discussed it with her). We’ll see how this gets fixed…

When we saw this thing in our back yard I was getting ready to call the zoo to ask if they had lost an elephant. Then we realized it was our A/C unit! I’ve never seen such a gigantic unit in my entire life. Or well, I’ve seen them, but they’ve usually cooled 50 unit apartment buildings. Something or another about a law that congress recently passed. I still find it hard to believe that this is the smallest they could do!

Other than that nothing to report. I suppose we could go paint at the house for a couple of hours, but I had an exhausting all day photo shoot today and am not exactly up for any work at the house. Tomorrow we’ll start bright and early…

Posted in Our Bungalow, Photos | Comments Off on Vent & HVAC – 01/19/2007

Painting Part Two – 01/17/2007

The bathroom sconce that will go above the medicine cabinet has been one freakin’ pain in the ass. I think I mentioned it before, but we were originally interested in the Bonneville sconce by Rejuvenation. It was a little on the pricey side, and having bought their Raleigh chandelier we decided to go with the less pricey Leighton Triple Sconce from Restoration Hardware instead(which is of course now on sale after we bought it!). It was not available in store, so they had to special order it for us and sent it free of charge to our house. Only it was broken – one of the rods was broken off. After much hassle we returned it and received a new one in the mail – which was crooked! Patrick had already gotten very fed up after the hassle we had to go through the first time we returned it. This time we just arranged things over the phone and the sconce was picked up and a third one was delivered. Of course we said the whole “third one’s a charm” thing – until we noticed a chip on the white porcelain part! Arrrrgh. Three sconces and all of them messed up!! I was on the phone with the girl again and told her just to give us a discount, but 10% wasn’t much for a sconce that we actually did want to hang on the wall. So we gave it a fourth try…and the fourth try actually was a charm!

Patrick with our fourth (undamaged) sconce.

In the meanwhile more trouble arose. The template people came in the morning, and the floors guys were supposed to come back that afternoon to do a second coat of polyurethane. We got a call at 5:00 or 5:30 and were informed the guys had a flat and couldn’t make it until Thursday. The only problem with this was that Thursday evening was our window of opportunity to start priming the bathroom walls since we wouldn’t be able to do so Wednesday because of drying floors. Wednesday was supposed to be our “day off” from the house, so we made dinner plans with several friends. Well, when that call came we realized we’d have to go to the house right then and there to get at least a tiny bit of priming in before our dinner appointment…

Patrick priming the bathroom walls. We only got about half-way done before we had to head out.

…and if that delay hadn’t kind of messed things up enough, we again heard from our contractor Thursday afternoon that she never got a call from the floor guys. We headed over there just now and sure enough – no second coat! Grrrr. So we could have done some more painting (on the coldest night of the year yet!). I wonder what delays this will cause. The electrician is due back Saturday to finish off his work – eek.

In good news though, the counter top people told us that they would be able to meet our January 30th deadline afterall. They usually take 2-3 weeks between templating and installation, and the 30th would have been 13 days, so cutting it tight! At first they said they wouldn’t be able to finish in time, but today they said they should be able to squeeze it in after all. Yippy! But I’ll still hold my breath until I see it.

Posted in Our Bungalow, Photos | Comments Off on Painting Part Two – 01/17/2007